Page 28 - ITAtube Journal 2 2026
P. 28
Press releases
Admiralty Industries Corp.
Condenser Tubing for NA-SA’s
Embalse Nuclear Power Plant
11,600 Admiralty Brass tubes supplied for
main condenser retubing under full heat
traceability.
• Full-scale production released only after
NA-SA homologated every process step
against a qualification batch of approxi-
mately 100 tubes
• Heat traceability held across all 11,600
tubes, each linked to its raw material ori-
gin, processing conditions and inspection
records
• Documentation dossier and every supply
phase formally approved by NA-SA’s Quali-
ty Department; material inspected, packed
and released for installation
Admiralty Industries has completed the
manufacture and supply of 11,600 condens-
er tubes for Nucleoeléctrica Argentina S.A.
(NA-SA), for the main condenser retubing of
the Embalse Nuclear Power Plant in Córdo-
ba, Argentina. The tubes were produced in
Admiralty Brass to ASTM B111 UNS C44300
at 25.40 mm outside diameter and 1.24 mm
minimum wall, each in a single continuous
length of 10,070 mm — approximately 116.8
kilometres of drawn tube in total.
Embalse is Argentina’s only CANDU-type
pressurised heavy water reactor and is
operating in an extended life cycle following
a major refurbishment programme. Man-
ufacturing was completed in March 2026
and the material shipped in May 2026, in
preparation for the plant’s scheduled main-
tenance outage in September and October
2026. The specified minimum wall and the
single ten-metre length placed the demand
on straightness, ovality and wall distribution,
controlled through the drawing schedule
and the heat treatment cycle rather than
corrected at final inspection.
Pre-production qualification
The project opened with a qualification
batch of approximately 100 tubes, manu-
factured to homologate each process step,
validate production parameters, confirm
dimensional, mechanical and chemical
compliance, and align inspection method-
ologies between supplier and client. NA-SA
engineering and quality personnel reviewed
and validated all processes, and granted the
approval required to proceed to full-scale
production.
“The supplier demonstrated professionalism
and consistency throughout the entire pro-
cess,” said Julio Sescun, Engineering Depart-
ment, and Ramiro Angeletti, Quality Control
Department, of NA-SA. “The pre-production
qualification phase, involving the initial
batch of tubes, was executed with rigour
and transparency, allowing all manufactur-
ing steps to be homologated and validated.”
Production and heat traceability
Full-scale manufacturing was carried out
under controlled and closely monitored con-
ditions, in alignment with the parameters
validated during qualification. The produc-
tion sequence covered transformation of
the raw material through tube drawing, heat
treatment, straightening and dimensional
control, followed by non-destructive test-
ing — eddy current examination with both
internal and external probes — and final
mechanical and chemical verification.
Fig. 1 Admiralty Brass condenser tubes to ASTM B111
Full heat traceability was maintained
UNS C44300, 25.40 mm OD × 1.24 mm minimum
throughout, each tube linked to its corre-
wall, end-capped following final inspection.28 ITAtube Journal September 2026